Construction Services

Renovation, fit-out and A&A — built right, delivered on time.

Construction Services

A renovation or fit‑out is one of the biggest investments you’ll make in a home or business — and the difference between a smooth project and a stressful one usually comes down to having a single accountable team. wefix delivers premium renovation, fit‑out and addition & alteration (A&A) construction for homes and businesses across Singapore, coordinating design, trades, permits and finishing under one roof. This page is your complete guide to our construction services: what we build, how projects are sequenced, what things cost, and how to get started.

Key takeaways

  • One accountable team, design to handover — no juggling separate contractors.
  • Full scope — home renovation, commercial fit‑out, A&A, hacking & masonry, false ceiling and flooring.
  • Sequence matters — waterproofing before tiling, wiring planned around layout, carpentry measured last.
  • Clear scope, schedule and pricing — quoted in detail so there are no surprises.

Construction services we offer

From a full‑home renovation to a single structural alteration, we cover the complete range of construction and fit‑out work. Each service has its own page — click through for detail, or book a consultation and we’ll scope the whole project with you.

Service What it covers Typical for
Home renovation Full‑home & room‑by‑room, wet works, carpentry, finishing HDB flats & condos
Commercial renovation & fit‑out Offices, retail, F&B, partitions, M&E Businesses & landlords
Addition & alteration (A&A) Structural changes with permit coordination Landed & larger works
Hacking & masonry Demolition, brickwork, screeding Layout changes
False ceiling & partition L‑box, cove lighting, drywall partitions Lighting & zoning
Flooring & tiling Vinyl, laminate and tiles, supplied & laid Any room

How a renovation is sequenced

A smooth renovation depends on doing things in the right order. Get the sequence wrong and you pay for rework; get it right and trades flow cleanly into one another. In broad terms:

Stage Work Why the order matters
1 Hacking & demolition Clears the space and exposes what’s behind walls and floors
2 Wet works & waterproofing Must be sealed and cured before any tiling goes down
3 Plumbing & electrical rough‑in Routed to suit the final layout, before walls close up
4 Tiling & flooring Laid on prepared, waterproofed surfaces
5 Ceilings, carpentry & painting Carpentry measured after other trades; painting near the end
6 Finishing & handover Fittings, clean‑up, defects check

See our HDB renovation checklist and how long a renovation takes for the full picture.

What projects typically cost

Budgets vary enormously with scope and finishes, but these indicative ranges help you plan. For detailed breakdowns, follow the links to our cost guides.

Project Indicative range (SGD)
Full HDB renovation (4‑room) $40,000 – $65,000
Kitchen renovation $10,000 – $25,000+
Office fit‑out (per sq ft) $30 – $120+ psf
Full false ceiling (per sq ft) $4 – $9 psf
Vinyl flooring (overlay, per sq ft) $3 – $6 psf

Indicative only — book a free consultation for a scoped quote. Keep a 10–15% contingency, especially in older resale flats.

HDB vs condo vs commercial

Where you’re renovating shapes the rules, timeline and approvals:

Homes (HDB & condo)

Commercial spaces

  • Landlord approvals and M&E coordination
  • Often built after hours to limit downtime
  • Lease‑end reinstatement to budget for early

Why one accountable team matters

When design, trades, permits and finishing sit with separate parties, the gaps between them are where projects slip — missed sequencing, finger‑pointing over defects, and schedule drift. We coordinate the whole job under one roof, so there’s a single point of accountability from the first drawing to the final defects check. Clear scope, clear schedule, clear pricing.

Frequently asked questions

Do you handle permits and approvals? Yes — we coordinate the necessary submissions for HDB, condo MCST and commercial landlords.

Can I renovate in phases? Yes — room by room is a good way to manage budget, and we’ll plan the sequence around it.

How much contingency should I keep? Around 10–15%, more for older resale flats where surprises are likelier.

Do you provide a detailed quote? Yes — itemised scope, schedule and pricing so you know exactly what’s included.

What’s usually the biggest cost? Carpentry, in most home renovations, followed by wet works and tiling.

Start your project

Book a free consultation and we’ll walk you through scope, budget and timeline. Need a smaller repair instead? See our handyman services.

Ready to get it fixed?

Free quotes, fast response, and workmanship you can trust — across Singapore.